[ntp:questions] stepping and slewing
Riccardo Castellani
castellani.riccardo at tiscali.it
Tue May 1 10:42:30 UTC 2007
According to www.ntp.org in stanard Linux o.s. (adjtime(2) - http://www.ntp.org/ntpfaq/NTP-s-algo.htm#S-ALGO-BASIC) time adjusting has rate of 0.5ms per second to slew time but because do you speak about "maximum" rate of 0.5 ms/sec. ? Does ntpd use always the same 0.5 as value or it's a variable parameter ?
I'm confused because "Rob MacGregor" said about step method (128ms < offset < 1000s) :
Stepping: Time changes in large units, quickly
With "Step" method (settimeofday), time is gradually changed with higher rate or time is changes immediately to correct time.
example for use step method : my local clock is 5:00 pm and real time is 5:05 pm, Ntpd set immediately local clock to 5:05 pm or it corrects time gradually ?
----- Original Message -----
From: Richard B. Gilbert
Newsgroups: comp.protocols.time.ntp
To: questions at lists.ntp.isc.org
Sent: Monday, April 30, 2007 9:02 PM
Subject: Re: [ntp:questions] stepping and slewing
Riccardo Castellani wrote:
> but can I define slew rate and step rate ?
> Pheraps these parameters are defined inside kernel of o.s. ?
> slew rate is always 0.5 ms/sec ?
No! That is the maximum slew rate. It's a limit built into most Unix
and Unix-like operating systems.
What problem are you trying to solve? ntpd works very well for most of
us, just as it is.
_______________________________________________
questions mailing list
questions at lists.ntp.isc.org
https://lists.ntp.isc.org/mailman/listinfo/questions
More information about the questions
mailing list